Vendor · #5331 by total payments to the State of Delaware

Masonry INC

Masonry INC has been paid $280,475 by the State of Delaware since FY2018, primarily through Dept of Education's Brandywine School District division.

Appears in budget docsIn 28 documents
$280K
total payments · FY18–FY25
18
19
20
21
25
Aug 28, 2017First payment
Jan 13, 2025Last payment
30Payments
56Documents
5Programs
4Agencies

Relationships

Documents

Where this vendor appears in the archived record — with the exact pages, so you never have to hunt through a PDF.

Capital Budget Book FY27 Governor's Recommended Capital Budget - State 2027 1 mention
On pages 3
Show the quotes (1)

… at the New Castle Courthouse Museum, repairs to multiple outbuildings at the Cooch's Bridge Historic Site, as well as masonry and landscaping needs at the Cooch Dayett Mill site and Mill Race, maintaining site safety and public access at the B …

Open p.3 ↗
On pages 35
Show the quotes (1)

… at the New Castle Courthouse Museum, repairs to multiple outbuildings at the Cooch's Bridge Historic Site, as well as masonry and landscaping needs at the Cooch Dayett Mill site and Mill Race, maintaining site safety and public access at the B …

Open p.35 ↗
On pages 5
Show the quotes (2)

… pgrade Project • Carvel State Office Building 3rd Floor Bathroom Renovation Project • Amoco Building Exterior Masonry Repairs • Troop 2 Roof Replacement Project • Troop 2 Generator Replacement Project • Leonard L Williams Justi …

Open p.5 ↗

… 3 Parking Lot Repaving Project • Troop 5 Ballistic Glass and Door Enhancements • Sussex County Chancery Court Masonry Repairs • Sussex County Courthouse Cooling Tower and Pump Replacement 5 Troop 6 Kirkwood Highway 6 Sussex …

Open p.5 ↗
Capital Budget Book 02-00 Judicial FY27 Bond Bill Presentation 2027 1 mention
On pages 4
Show the quotes (1)

… 26 7 Custom House ▪ Finishing structural steel and concrete. ▪ On-going work includes framing, fireproofing, masonry mobilization, and wall and stucco activities. 8 7 8 4/27/2026 5 Summary FY 27 Project Request FY 26 Appropriat …

Open p.4 ↗
On pages 183 184
Show the quotes (2)

… red to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet curre …

Open p.183 ↗

… uildings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easily …

Open p.184 ↗
On pages 184
Show the quotes (2)

… d to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet cur …

Open p.184 ↗

… ldings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easil …

Open p.184 ↗
Annual Agency Report Performance Report Capital Projects Fund 2025 Report 2025 1 mention
On pages 62
Show the quotes (1)

… ell as some of the brick facade. Additionally, the team has completed stair tower demolition, removing the concrete masonry unit walls down into the basement. Interior demolition is in full swing. Basement demolition is almost complete. The …

Open p.62 ↗
On pages 342 691 759 762 763 765
Show the quotes (6)

… ction 3 Opportunities. Approximately 200 construction jobs are projected per CN housing phase for work in demolition, masonry, carpentry, concrete, drywall, day labor, sprinkler installer, landscaping, and cleaning. Eligible Section 3 resident …

Open p.342 ↗

… hours/month on average, 48.0% performed by Section 3 workers. Nine Section 3 businesses were utilized for earthwork, masonry, rough carpentry, siding, mechanical, drywall, STATE OF DELAWARE DIVISION OF ACCOUNTING AMERICAN RESCU …

Open p.342 ↗

… As a result, young people representing a statewide cohort of almost 1,000 students in construction, electrical, HVAC, masonry, millwright, plumbing, sheet metal, and welding pre-apprenticeships graduate from high school having completed the fi …

Open p.691 ↗

… operative not only provides labor to these P2B contractors but is also being developed as a niche service provider in masonry and drywall finishing, working under a retired union mason and other trade professionals to grow into a self-sustainin …

Open p.759 ↗

… ERICAN RESCUE PLAN ACT State of Delaware 2025 Recovery Plan Performance Report 434 THE AMERICAN RESCUE PLAN masonry, painting, and finish carpentry— preparing them for long-term union careers and on-the-job placements with local contr …

Open p.762 ↗

… ive has already performed subcontracting work on multiple P2B Housing Initiative projects, including waterproofing and masonry work at 801 S. Harrison Street and drywall preparation and repair at 38 E. 23rd Street. The cooperative continues to …

Open p.762 ↗
Financial Report October 2025 SLFRF Quarterly Report 2025 2 mentions
On pages 184
Show the quotes (2)

… red to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet curre …

Open p.184 ↗

… uildings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easily …

Open p.184 ↗
Financial Report July 2025 SLFRF Quarterly Report 2025 2 mentions
On pages 182 183
Show the quotes (2)

… red to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet curre …

Open p.182 ↗

… uildings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easily …

Open p.183 ↗
Financial Report April 2025 SLFRF Quarterly Report 2025 2 mentions
On pages 182 183
Show the quotes (2)

… red to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet curre …

Open p.182 ↗

… uildings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easily …

Open p.183 ↗
Financial Report January 2025 SLFRF Quarterly Report 2025 2 mentions
On pages 195
Show the quotes (2)

… red to ensure proper air flow and mitigate moisture retention and mold growth. No insulation was observed in exterior masonry perimeter walls and minimal insulation was reported in attics. As such, existing insulation systems do not meet curre …

Open p.195 ↗

… uildings are of similar type and size with the same building materials and color palette - two-story, unpainted brick masonry townhomes. Given the large areas of buildings with similar exteriors and few other visual references, one can easily …

Open p.195 ↗

Programs

ProgramAgencyAmountYears
Brandywine School District Dept of Education $222,825 FY18–FY25
Capital Project Cost Center Dept of Transportation $39,600 FY18–FY25
Toll Administration Dept of Transportation $11,200 FY18–FY25
First State Montessori Academy Dept of Education Continued $4,900 FY18–FY25
Facilities Management Executive $1,950 FY18–FY25

Money

Where it goes
By category
Building/Grounds Repair
$276K
Maintenance
$5K
Which pot of money
1ststate Montessori Acad Local
$5K
By fiscal year
FY18$57K
FY19$15K
FY20$192K
FY21$11K
FY25$5K
How the spending is booked 1 account lines
AccountAmountLine items
Maintenance$4,9001

Fund and account lines come from the expenditure-detail dataset (source ↗), which itemizes payments at a finer grain than the checkbook.

Yearly totals — full table 5 fiscal years
Fiscal yearTotalChecks
FY18$57,0007
FY19$15,3001
FY20$192,07519
FY21$11,2002
FY25$4,9001
Browse every payment 30 checks →
Recent payments latest 15 checks
DateDepartmentCategoryAmount
Jan 13, 2025 Dept of Education ContinuedMaintenance $4,900
May 24, 2021 Dept of TransportationBuilding/Grounds Repair $1,400
Mar 1, 2021 Dept of TransportationBuilding/Grounds Repair $9,800
Jun 23, 2020 Dept of EducationBuilding/Grounds Repair $6,480
Jun 23, 2020 Dept of EducationBuilding/Grounds Repair $4,320
Jan 23, 2020 Dept of EducationBuilding/Grounds Repair $4,600
Jan 7, 2020 Dept of TransportationBuilding/Grounds Repair $3,200
Jan 7, 2020 Dept of TransportationBuilding/Grounds Repair $2,900
Jan 7, 2020 Dept of TransportationBuilding/Grounds Repair $9,700
Jan 7, 2020 Dept of TransportationBuilding/Grounds Repair $8,900
Jan 7, 2020 Dept of TransportationBuilding/Grounds Repair $14,900
Nov 27, 2019 Dept of EducationBuilding/Grounds Repair $5,900
Nov 4, 2019 Dept of EducationBuilding/Grounds Repair $1,800
Oct 25, 2019 Dept of EducationBuilding/Grounds Repair $2,900
Aug 21, 2019 Dept of EducationBuilding/Grounds Repair $3,700

Source: State of Delaware checkbook · synced 2026-07-25. Open source dataset ↗

Source datasets

State checkbook (payments) · synced 2026-07-25 data.delaware.gov/d/5s6n-7hpx ↗
Document archive 6,110 verified state documents · methodology