Mentions of “INDIRECT COST” — 200 found on pages 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 16, 17, 18, 19, 20, 23, 24, 25, 26, 27
… no required state contribution. There are no positions associated with this grant. Audit fees have been budgeted, and indirect costs are not applicable. The CASA Program utilizes trained volunteers to advocate for children who are in foster car …
Open p.3 ↗… required state contribution. There are no positions associated with this grant. Audit fees have been budgeted and indirect costs are not applicable. The Clean Corridor Coalition is a multi -state effort to deploy medium -and heavy- duty zer …
Open p.4 ↗… rts overtime expenses that are incurred for state personnel as a result of the em ergency response. Audit fees and indirect costs have been budgeted. The National Animal Health Surveillance System (APHIS) Cooperative Agreement serves to prot …
Open p.4 ↗… sts 1.00 new NSF FTE bringing the total to 25.50 NSF FTEs and 10.50 GF FTEs. Audit fees were previously budgeted, and indirect costs are not applicable. The ARNG Operations and Maintenance Agreement provides funds to support operations and main …
Open p.5 ↗… e project. There is no required state contribution. There are no positions associated with this grant. Audit fees and indirect costs are not applicable. The CJA provides funding that will be administered by CJC but passed to the Office of the …
Open p.6 ↗… no required state contribution. There are no positions associated with this grant. Audit fees have been budgeted, and indirect costs are not applicable. The Pipeline Safety One Call Grant, in conjunction with the Natural Gas Pipeline Safety P …
Open p.6 ↗… that were previously budgeted and will remain as limited-term positions for the duration of the grant. Audit fees and indirect costs were previously budgeted. This grant provides funding specific to enhancing detection to support necessary expe …
Open p.7 ↗… NSF FTEs were previously budgeted) . There is no required state contribution. Audit fees were previously budgeted and indirect costs are budgeted. This grant funding is focused on providing support for core infrastructure improvements within DP …
Open p.8 ↗