Appropriation Bill

HB 295 — Session Law

Download PDF Open original ↗

Mentions of “ENVIRONMENTAL” — 2 found on pages 2

… itle 7 to the contrary, Transit Center, LLC is not considered a potentially liable party with respect to the existing environmental condition at the Project Site as of the date it acquires a leasehold interest in the property. Section 5. Amend Ch …

Open p.2 ↗

… long US 13. The Garashes “L” project consists of the realignment of the roadway, sidewalk connections, drainage, and environmental remediation. The Garashes “L” project must be constructed per the Department’s approved plans, completed no later th …

Open p.2 ↗

Search inside this document

Referenced entities

Vendors named in this document

1 mention Pages: 1
1 mention Pages: 2
1 mention Pages: 1
1 mention Pages: 2
1 mention Pages: 2

Vendor names in text

Chapter 91 of Title 7 to the contrary, Transit Center, LLCRiverfront Development CorporationTransit Center, LLC