… contaminated sites; Removing or abandoning ta nks not necessary for operations; Upgrading underground fuel oil storage tanks to meet U.S. Environmental Protection Agency requirements; Maintaining an inventory and managemen …
Open p.3 ↗… variable units; the installation of an air cooled chiller; and the replacement of the hot water heater, condensing boiler and fire alarm system. CAPITAL REQUEST FUNDING S TATE F EDERAL O THER FY 2018 $260,000 $0 $0 FY 2019 1,300 …
Open p.5 ↗… g mechanical equipment in CSOB. This project would include the replacement of HVAC equipm ent, cooling tower and boilers and also includes relocation costs. Design is underway and includes exploring the benefits of connecting to the …
Open p.6 ↗