… include the following:  Chiller replacement;  Boiler replacement;  HVAC unit replacement and relocation; and  Electrical upgrades. CAPITAL REQUEST FUNDING STATE F EDERAL O THER FY 2016 $1,820,000 $0 $0 FY 2017 0 0 0 FY 2018 0 0 …

Open p.3 ↗

… Improvements include:  Mechanical upgrades;  Sprinkler system replacement;  Fire alarm system replacement;  Electrical upgrades; and  Elevator refurbishment. CAPITAL REQUEST FUNDING S TATE F EDERAL O THER FY 2016 $800,000 $0 …

Open p.4 ↗

… ding. Improvements include:  Mechanical upgrades on the first and ground floors;  Elevator rehabilitation;  Electrical switchgear and distribution system replacement; and  Emergency generator installation. CAPITAL REQUEST FUNDI …

Open p.5 ↗

… ure and equipment. Work includes:  Phased renovation of seventeen elevators and six escalators;  Replacement of electrical and lighting controls;  Rehabilitation of outdated detention plumbing; and  Repair of building envelope. CAPI …

Open p.5 ↗

… ding. This project includes 22 OFFICE OF MANAGEMENT AND BUDGET 10-02-00 the replacement of the HVAC system, electrical switchgear and distribution, and generator. Additionally, this project includes the installation of a fire alarm …

Open p.6 ↗

Search inside this document

Referenced entities

Vendors named in this document

4 mentions Pages: 1 3
3 mentions Pages: 2 6
2 mentions Pages: 5
2 mentions Pages: 6
2 mentions Pages: 2 6
1 mention Pages: 6