Mentions of “Traffic” — 25 found on pages 3, 12, 15, 21, 30, 31, 33, 34, 44
… ays such as I -295. The design will consider all users, including pedestrians, and add roundabouts for better, saf er traffic flow. The project benefits the surrounding underserved, overburdened, disadvantaged communities, and the project has …
Open p.3 ↗… ector. This project will include roadway widening, stormwater management facilities, multiple intersection redesigns, traffic signal reconfigurations and multi-modal improvements. State Federal Other FY 2015 $ - $ …
Open p.12 ↗… lytown Road with McGinnis Pond Road and realign Peach Tree Run Road with Fox Chase Road. It will also assess possible traffic control devices at these newly created intersections including the option for potential roundabouts. State Federal O …
Open p.15 ↗… unding is requested for a new grade separated intersection, south of Georgetown, to accommodate current and projected traffic and improve safety. State Federal Other FY 2027 $ - $ 4,000,000 $ - Total $ - $ 4,000,000 …
Open p.21 ↗… nding is req uested for a new grade separated intersection, south of Georgetown, to accommodate current and projected traffic and improve safety. State Federal Other FY 2027 $ - $ 4,500,000 $ - FY 2028 $ - $ 4,500,000 …
Open p.21 ↗… sted for the design and construction of ped estrian and bicycle facilities, transit access, park and ride facilities, traffic calming and other non-motorized transportation projects. State Federal Other FY 2024 $ 1,750,000 $ …
Open p.30 ↗… or turn lanes at intersections; • Concrete pavement repairs; • Repair/replacement of curbs, gutters and sidewalks; • Traffic control devices (including those necessary for pedestrian, transit and bicycle access); • Rotomilling; • Crossover mo …
Open p.31 ↗… sted as separate projects in the CTP. In addition, necessary replacements of sign struc tures, high mast lighting and traffic signal replacements as identified by the Sign Structure Inspection Program are funded through these contracts. Sta …
Open p.31 ↗