Mentions of “TOWN OF FARMINGTON” — 1 found on pages 43
… 2021 Upper King Rd. / Johnson Phase II Approx. 3,000' of open ditch Scoping $ 30,000.00 34 16 2021 Town of Farmington Drainage outlets Scoping $ 80,000.00 30 16 2021 Cheswold / Strimel Approx. 1,000' of open ditch Scop …
Open p.43 ↗