Capital Budget Book

FY27 Governor's Recommended Capital Budget - Office of Management and Budget

Download PDF Open original ↗

Mentions of “ENERGY” — 5 found on pages 8, 9

… e assets such as HVAC systems and windows, which are essential to ensuring reliable operations, occupant comfort, and energy efficiency. In addition, this funding will support the conversion of former jail holding cells into functional office …

Open p.8 ↗

… work includes: Boiler Replacement – Replacement of the existing boiler system to ensure reliable heating, improve energy efficiency, and reduce long-term operating costs. Lighting Upgrades – Comprehensive lighting upgrades throughout …

Open p.8 ↗

… ades – Comprehensive lighting upgrades throughout the building to enhance occupant comfort and safety while achieving energy and maintenance savings. Funding Schedule State Federal Other FY 2027 $ 5,000,000 $ - $ - Total $ 5,000, …

Open p.8 ↗

… and Boiler Replacement – replacement of the existing systems to ensure reliable heating and air conditioning, improve energy efficiency, and reduce long-term operating costs. Generator Upgrade – to enhance resiliency and continuity of oper …

Open p.9 ↗

… ades – comprehensive lighting upgrades throughout the building to enhance occupant comfort and safety while achieving energy and maintenance savings. Flooring and Painting – to refresh and modernize interior spaces, improving both function …

Open p.9 ↗

Search inside this document

Referenced entities

Vendors named in this document

2 mentions Pages: 3 4